Capacity adequacy in the Nordic electricity market /

And Conclusions -- 1. Introduction -- 2. Relevant Definitions -- 3. Current situation and historical evidence -- 4. Generation gap Outlook -- 5. Policy and market measures for capacity adequacy -- 6. Summary ofrecommendations -- Appendix 1: EC Checklist -- Appendix 2: The The-MA power market model -...

Full description

Saved in:
Bibliographic Details
Corporate Author: Nordic Council of Ministers.
Format: eBook
Language:English
Published: Copenhagen, [Denmark] : Thema Consulting Group, 2015.
Series:TemaNord ; 560.
Subjects:
Online Access:CONNECT
CONNECT
LEADER 03482cam a2200589Mi 4500
001 mig00005958006
003 OCoLC
005 20210609044936.8
006 m o d
007 cr cn | |||||
008 160714t20152015dk a ob 000 0 eng d
020 |a 9289342870 
020 |a 9789289342872 
020 |a 9289342862 
020 |a 9789289342865 
035 |a (OCoLC)1109552342 
035 0 0 |a ocm00000001wrldshron1109552342 
040 |a EQF  |b eng  |e rda  |e pn  |c EQF  |d OCLCO  |d OCLCF 
043 |a ev----- 
049 |a TXMM 
050 4 |a TJ163.25.S34  |b .N673 2015 
082 0 4 |a 333.790948  |2 23 
110 2 |a Nordic Council of Ministers. 
245 1 0 |a Capacity adequacy in the Nordic electricity market /  |c Nordic Council of Ministers. 
264 1 |a Copenhagen, [Denmark] :  |b Thema Consulting Group,  |c 2015. 
264 4 |c ©2015 
300 |a 1 online resource (142 pages) :  |b illustrations (some colour), colour maps. 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
490 1 |a TemaNord,  |x 0908-6692 ;  |v 560 
504 |a Includes bibliographical references. 
520 |a And Conclusions -- 1. Introduction -- 2. Relevant Definitions -- 3. Current situation and historical evidence -- 4. Generation gap Outlook -- 5. Policy and market measures for capacity adequacy -- 6. Summary ofrecommendations -- Appendix 1: EC Checklist -- Appendix 2: The The-MA power market model -- Appendix 3: Key model assumptions. 
520 |a An increasing share of intermittent renewable generation and reduced profitability of conventional power generation has led to a growing concern for capacity adequacy in the Nordic electricity market (Nord Pool market area). It does not make sense to assess capacity adequacy for each country separately in the Nord Pool market area as it is highly integrated in terms of both interconnector capacity and market integration. Capacity challenges are rarely isolated to one country or bidding zone. This report analyses what market solutions may be used to manage capacity adequacy in the Nord Pool market area, and how an efficient transition to adequate market solutions could be achieved. The main analysis reveals several measures that would strengthen price formation and cost recovery in the Nord Pool market area, although in general, the market is already highly liquid and well-functioning. 
546 |a Text in English. 
588 |a Description based on online resource; title from PDF title page (ebrary, viewed July 12, 2016). 
590 |a Open Research Library 
650 0 |a Power resources  |z Scandinavia. 
650 0 |a Energy development  |z Scandinavia. 
650 0 |a Energy consumption  |z Scandinavia. 
650 0 |a Electric power  |z Scandinavia. 
710 2 |a Nordic Council of Ministers,  |e issuing body. 
730 0 |a Knowledge Unlatched records 
776 0 |z 92-893-4285-4 
830 0 |a TemaNord ;  |v 560. 
856 4 0 |u https://openresearchlibrary.org/content/912bd464-1992-4436-bf62-b3b67983d383  |z CONNECT  |3 KNOWLEDGE UNLATCHED  |t 0 
907 |a 5414070  |b 06-15-21  |c 06-09-21 
998 |a wi  |b 06-09-21  |c m  |d z   |e -  |f eng  |g dk   |h 0  |i 1 
994 |a 92  |b TXM 
999 f f |i fc8c3e04-d593-404f-a166-edaabb30a7b6  |s eb6cb2cd-2a0e-44a0-978a-6e88814da41b  |t 0 
952 f f |t 1  |e TJ163.25.S34 .N673 2015  |h Library of Congress classification 
856 4 0 |3 KNOWLEDGE UNLATCHED  |t 0  |u https://openresearchlibrary.org/content/912bd464-1992-4436-bf62-b3b67983d383  |z CONNECT