Guidelines for inservice testing at nuclear power plants : inservice testing of pumps and valves and inservice examination and testing of dynamic restraints (snubbers) at nuclear power plants, final report /

Saved in:
Bibliographic Details
Main Author: Bedi, Gurjendra S. (Author)
Format: Government Document Electronic eBook
Language:English
Published: Washington, DC : Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, October 2013.
Edition:Revised 2.
Subjects:
Online Access:CONNECT

MARC

LEADER 00000nam a2200000 i 4500
001 mig00005024537
003 OCoLC
005 20160907145554.0
006 m o d f
007 cr |||||||||||
008 160803e201310 dcu obt f000 0 eng c
035 0 0 |a ocn954581618 
040 |a GPO  |b eng  |e rda  |e pn  |c GPO  |d MvI 
042 |a pcc 
049 |a TXME 
074 |a 1051-H-48 (online) 
086 0 |a Y 3.N 88:10/1482/REV.2/FINAL 
088 |a NUREG-1482 
099 |a Online Government Document 
100 1 |a Bedi, Gurjendra S.,  |e author. 
245 1 0 |a Guidelines for inservice testing at nuclear power plants :  |b inservice testing of pumps and valves and inservice examination and testing of dynamic restraints (snubbers) at nuclear power plants, final report /  |c prepared by Gurjendra S. Bedi. 
246 3 0 |a Inservice testing of pumps and valves and inservice examination and testing of dynamic restraints (snubbers) at nuclear power plants, final report 
250 |a Revised 2. 
264 1 |a Washington, DC :  |b Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission,  |c October 2013. 
300 |a 1 online resource (various pagings) 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
500 |a Title from title screen (viewed on July 29, 2016). 
500 |a "NUREG-1482, revision 2." 
500 |a "Manuscript completed: September 2013; date published: October 2013." 
500 |a "Performing organization: Division of Engineering, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission"--Bibliographic data sheet. 
504 |a Includes bibliographical references. 
513 |a Technical. 
650 0 |a Nuclear power plants  |x Piping  |x Valves  |x Testing. 
650 0 |a Nuclear power plants  |x Instruments  |x Testing. 
710 2 |a U.S. Nuclear Regulatory Commission.  |b Office of Nuclear Reactor Regulation.  |b Division of Engineering,  |e issuing body. 
776 0 8 |i Print version:  |a Bedi, Gurjendra S.  |t Guidelines for inservice testing at nuclear power plants  |w (OCoLC)895387738 
856 4 0 |z CONNECT  |u http://purl.fdlp.gov/GPO/gpo70684  |t 0 
907 |a 3652931  |b 06-10-21  |c 03-20-18 
998 |a wi  |b 03-20-18  |c m  |d z   |e -  |f eng  |g dcu  |h 0  |i 1 
910 |a MTSUM(2016) 9,10,11,12 
910 |a DWS 
999 f f |i 989f916e-47bd-4f31-a48b-2077613bfb7f  |s f32a710f-0566-484d-a0cd-37a88c40c186  |t 0 
952 f f |a Middle Tennessee State University  |b Main  |c James E. Walker Library  |d Electronic Resources  |t 0  |e Y 3.N 88:10/1482/REV.2/FINAL  |h Library of Congress classification 
856 4 0 |t 0  |u http://purl.fdlp.gov/GPO/gpo70684  |z CONNECT