Accelerated bridge construction : best practices and techniques /

The traveling public has no patience for prolonged, high cost construction projects. This puts highway construction contractors under intense pressure to minimize traffic disruptions and construction cost. Actively promoted by the Federal Highway Administration, there are hundreds of accelerated bri...

Full description

Saved in:
Bibliographic Details
Main Author: Khan, Mohiuddin A.
Format: Electronic eBook
Language:English
Published: Amsterdam ; Boston : BH/Elsevier, 2014.
Subjects:
Online Access:CONNECT

MARC

LEADER 00000cam a2200000 i 4500
001 in00006558401
006 m o d
007 cr |n|||||||||
008 140918s2014 ne o 000 0 eng d
005 20240708135516.0
035 |a 1WRLDSHRocn890952530 
040 |a YDXCP  |b eng  |e rda  |e pn  |c YDXCP  |d OCLCQ  |d OCLCF  |d EBLCP  |d OPELS  |d TEFOD  |d N$T  |d DEBSZ  |d OCLCQ  |d TEFOD  |d OCLCQ  |d ITD  |d NRC  |d OCLCQ  |d U3W  |d D6H  |d OTZ  |d OCLCQ  |d S2H  |d OCLCO  |d OCLCQ  |d OCLCO  |d OCLCL  |d SXB  |d OCLCQ  |d OCLCO 
019 |a 887508611 
020 |a 0124072259  |q (electronic bk.) 
020 |a 9780124072251  |q (electronic bk.) 
020 |z 9780124072244 
020 |z 0124072240 
035 |a (OCoLC)890952530  |z (OCoLC)887508611 
037 |a F6C317CE-E8F8-4419-9252-E226F26F22CA  |b OverDrive, Inc.  |n http://www.overdrive.com 
050 4 |a TG300  |b .K43 2014 
082 0 4 |a 624.2  |2 23 
049 |a TXMM 
100 1 |a Khan, Mohiuddin A.  |1 https://id.oclc.org/worldcat/entity/E39PCjKtWy9FrmdpvmwyfqJwhb 
245 1 0 |a Accelerated bridge construction :  |b best practices and techniques /  |c Mohiuddin Khan. 
264 1 |a Amsterdam ;  |a Boston :  |b BH/Elsevier,  |c 2014. 
300 |a 1 online resource 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
505 0 |a Innovative construction methods -- Introduction to modern accelerated bridge construction -- Recent developments in abc concepts -- Research and training in abc structural systems -- Innovative abc techniques -- Recent developments in abc concepts -- Modular bridge construction issues -- Rapid bridge insertions following failures -- Abc planning and resolving abc issues -- Modular bridges -- Prefabrication of the superstructure -- Prefabrication of the substructure and construction issues -- Alternative abc methods and funding evaluation -- A review of chapters, river bridges, and conclusions. 
588 0 |a Print version record. 
520 |a The traveling public has no patience for prolonged, high cost construction projects. This puts highway construction contractors under intense pressure to minimize traffic disruptions and construction cost. Actively promoted by the Federal Highway Administration, there are hundreds of accelerated bridge construction (ABC) construction programs in the United States, Europe and Japan. Accelerated Bridge Construction: Best Practices and Techniques provides a wide range of construction techniques, processes and technologies designed to maximize bridge construction or reconstruction operat. 
500 |a ScienceDirect eBook - Engineering 2014  |5 TMurS 
650 0 |a Bridges  |x Design and construction  |x Technological innovations. 
650 0 |a Modular construction. 
730 0 |a WORLDSHARE SUB RECORDS 
758 |i has work:  |a Accelerated bridge construction (Text)  |1 https://id.oclc.org/worldcat/entity/E39PCFrQbcrC4gGfbQdRpcVDMP  |4 https://id.oclc.org/worldcat/ontology/hasWork 
776 0 8 |i Print version:  |a Khan, Mohiuddin A.  |t Accelerated bridge construction.  |z 9780124072244  |z 0124072240  |w (DLC) 2014023530 
856 4 0 |u https://ezproxy.mtsu.edu/login?url=https://www.sciencedirect.com/science/book/9780124072244  |z CONNECT  |3 Elsevier  |t 0 
949 |a ho0 
994 |a 92  |b TXM 
998 |a wi  |d z 
999 f f |s f53b4f9a-3f94-4536-b4af-e73bd8b29fde  |i ebedc3d2-27b2-4da3-9e10-bb342da0353a  |t 0 
952 f f |a Middle Tennessee State University  |b Main  |c James E. Walker Library  |d Electronic Resources  |t 0  |e TG300 .K43 2014  |h Library of Congress classification